Minimum Curing Times for Bonded Windows
For safety reasons, use only non-conductive two-part
adhesive when installing windshield and rear window with the
materials listed below.
The vehicle can o
Overview - Windshield
1 - Windshield
Distance to roof frame: dimension -c- =
2.5 mm
Center the side distance to the A-pillars
2 - Adhesive Bead
Observe the minimum curing t
Overview - Rear Side Window
1 - Rear Side Window
Removing and Installing. Refer to
→ Chapter "Rear Side Window, Removing and Installing".
after installing push in first with the
Supercharger, Securing to Engine/Transmission Holder for Repair Work
Note
The openings on the bottom of the supercharger housing
should make it possible to see and reach the charge air cooler.
Special tools and workshop equipment
required
Engine and Gearbox Bracket -VAS6095A-
Gearbox Su