To complete the procedure, a second technician is required to be at
the following position.
Depending on the equipment version, the following additional work must be
performed.
Special tools a
Overview - Horn
1 - Lock Carrier
2 - Bolt
8 Nm
3 - Nut
11 Nm
4 - High Tone Horn -H2-
Removing and installing. Refer to
→ Chapter "High Tone Horn -H2-/Low Tone Horn -H7-, Removing and
Installing".
5 - Bracket
For the ri