Overview - Starter
1 - Starter
Removing and installing. Refer to
→ Chapter "Starter, Removing and Installing".
2 - Bolt
Tightening specification. Refer to
→ Automatic Transmission; Rep. Gr.37; Transmission, Removing and
Installing; Transmission T
Tower Brace Additional Reinforcement, Removing and Installing, Q7
without High-Voltage System
Special tools and workshop equipment
required
Pry Lever -80-200-
Torque Wrench 1331 5-50Nm -VAG1331-
Removing
- Remove the plenum chamber cover. Refer to
→ Body Exterior; Rep. Gr.50;&